UP-Pollock Halls Phase 3A
Pennsylvania State University (Penn State) intends to renew the Pollock Halls residential area at its University Park (UP) campus to address building age-related challenges and meet current student expectations.
The project, envisioned to be completed in multiple phases, currently includes the plan to renovate seven residence halls and remove two residence halls. The work also includes renewing the supporting systems in Pollock Commons and the corresponding connections through the service tunnels to the halls. The Pollock Halls site will also be renewed.
Phase 3A - Renovation of Ritner and Wolf Halls
Prequalification will be required for contracting but not for bidding. Contact Jackie LePore (LeporeJ@claycorp.com) for information.
Bid through Building Connected - https://app.buildingconnected.com/projects/66e1cabde54a6e00596c8f8b/bid-packages
Package Number | Package Name | Pre-Bid Date/Time | Pre-Bid Meeting | Bid Date/Time | Awarded To | Document |
---|---|---|---|---|---|---|
002.1 | Demolition | |||||
002.2 | Demolition - Sawcutting and Coring | |||||
003E | Concrete - Exterior | |||||
003I | Concrete - Interior | |||||
004 | Masonry | |||||
005 | Steel | |||||
006 | Fiber Reinforced Polymer & Scanning | |||||
007.1 | Elevators - Schulze | |||||
007.2 | Elevators - Wolfe and Ritner | |||||
008 | Roofing | |||||
010 | Glass & Glazing | |||||
011 | Finish Carpentry & Millwork | |||||
012 | Drywall, Metal Framing, & ACT | |||||
013 | Specialties | |||||
014 | Painting | |||||
015 | Fireproofing | |||||
016 | Doors, Frames, & Hardware | |||||
017 | Window Treatments | |||||
018 | Flooring Coverings | |||||
019 | Tile | |||||
020 | Music Room | |||||
021 | Mechanical/HVAC | |||||
022 | Electrical | |||||
023 | Plumbing | |||||
024 | Fire Protection | |||||
025 | Earthwork | |||||
026 | Micropiles | |||||
027 | Landscape | |||||
028 | Asphalt | |||||
029 | Final Cleaning | |||||
030 | Temporary Fencing | |||||
001 | Abatement | Mandatory |