UP-Pollock Halls Phase 3A
Abatement
Bid Date / Prevailing Time
Project
Package Number
001
Pre-bid Date/Time
Pre-Bid Location
In the lobby of Ritner Hall
Pre-Bid Meeting
Mandatory
Bid through Building Connected. https://app.buildingconnected.com/projects/66e1cabde54a6e00596c8f8b/bid-packages
Prequalification will be required for contracting but not for bidding. Contact Jackie LePore LeporeJ@claycorp.com
for information.
Document Distribution Method
Electronically through Building Connected
Anticipated Document Delivery