UP-WCSP Attemperator Water Purification

Project Number
00-09058.00
Project Status
Trade/Bid Packages
Campus
University Park
Project Description

Installation of a system to purify the attemperator water at the West Campus Steam Plant for the 800 PSI to 250 PSI pressure reducing station on the CT HRSG.

Penn State Project Leader Name, Email
Architect/ Engineer and Design Build Selection
Capital Project (>$10M)
No
Professional Consultant
Company Name
CMM, Inc.
Contact Name
Jeff Held
Phone
216-372-6505
Email
jheld@cmm-inc.com
Trade/Bid Package Information
Project Stage for Trade/Bid Package Information
Out to Bid
Prequalification

Contractors bidding to Whiting-Turner must be prequalified with Whiting-Turner. Prequalification with Whiting-Turner can be completed at: https://www.whitingturner.com/subcontractor-prequalification/

Additional Information
Bid Due Date and Time
Package Number Package Name Pre-Bid Date/Time Pre-Bid Meeting Bid Date/Time Awarded To Document
D23 Electrical Package - Reverse Osmosis Installation Recommended but not Mandatory
D26 Mechanical Package - Reverse Osmosis Installation Recommended but not Mandatory