Ostermayer Lab Building Renovation

Project Status
Complete - Architect/Engineer and Design/Build Selection
Campus
Greater Allegheny
Project Stage
Appointment Complete
Project Description

The Pennsylvania State University is excited begin the Design-Build (D-B) Team Selection process for the Greater Allegheny Ostermeyer Lab Renovation project. The project site is located in White Oak Township, Allegheny County at 4000 University Drive, McKeesport PA 15132, on University-owned property. The $14.0M project (total project cost) will support teaching and research labs for chemistry, organic chemistry and biology labs, faculty offices and student spaces.

The Pennsylvania State University is excited begin the Design-Build (D-B) Team Selection process for the Greater Allegheny Ostermeyer Lab Renovation project. The project site is located in White Oak Township, Allegheny County at 4000 University Drive, McKeesport PA 15132, on University-owned property. The $14.0M project (total project cost) will support teaching and research labs for chemistry, organic chemistry and biology labs, faculty offices and student spaces.

The existing 21,739 square foot Ostermeyer Lab Building was completed in 1973 and currently houses three chemistry and organic chemistry labs, two biology labs, laboratory prep rooms and laboratory storage, a general classroom and faculty offices. The project will include the complete interior, lab, and building system renovation to modernize and improve the facility along with improvements to the main entrance of the building. A comprehensive window replacement was recently completed. A program/ feasibility study for the renovation is currently being completed and will be used as the basis of design.

Architect/ Engineer and Design Build Selection
Capital Project (>$10M)
No
Date of Appointment Selection
Attachments for Architect/Engineering and Design/Build Selection
Trade/Bid Package Information
Bid Due Date and Time