AB-Woodland-Biology Lab Renovation

Project Number
00-09173.00
Project Status
Trade/Bid Packages
Complete - Architect/Engineer and Design/Build Selection
Campus
Abington
Project Stage
Letter of Interest
Project Description

Penn State Abington will be renovating the existing biology teaching labs and research spaces within the second-floor west wing of the Woodland Building. Renovations will include spatial reconfiguration, new interior finishes, and MEP upgrades to support the new laboratories. Abatement will be required.

Penn State Project Leader Name, Email
Architect/ Engineer and Design Build Selection
Capital Project (>$10M)
No
Project Stage for Architect/Engineer and Design/Build Selection
Appointment Complete
Date of Appointment Selection
Professional Consultant
Company Name
Chiang O'Brien Architects
Contact Name
Ryan Griffin
Phone
(607) 241-0244 x107
Email
ryan@chiangobrien.com
Attachments for Architect/Engineering and Design/Build Selection
Construction Manager Selection and Other Services
CM Firm
Company Name
P J Dick, Inc.
Contact Name
David Laudermilch
Phone
(484) 798-5205
Email
david.laudermilch@pjdick.com
Trade/Bid Package Information
Project Stage for Trade/Bid Package Information
Announcement
Prequalification

CM Firm Prequalification is not required to bid. However, before subcontracting with PJ Dick, please see Bidding Specification - Section L for complete details and form to submit prequalification.

Additional Information

The project is being bid through Building Connected: https://app.buildingconnected.com/public/5a0304ab19181d000f2b73bb. Access to the Bid Documents is intended for the bidder, their company, and entities involved in formulating the bid response. 

IMPORTANT: All bidders MUST submit their bid through Building Connected, or else their bid will not be accepted. Subcontractors MUST include Section A1.1- MBE & WBE Form. Please note that if no MBE or WBE is applicable, the Subcontractor shall still fill out N/A and submit the form.

Proposals will be received by the Construction Manager electronically, only through Building Connected. Proposals in any other format will not be accepted.

For questions regarding access to Building Connected, please email Zachary Hoose (PJ Dick) zachary.hoose@pjdick.com.

Bid Due Date and Time
Package Number Package Name Pre-Bid Date/Time Pre-Bid Meeting Bid Date/Time Awarded To Document
02A Abatement Mandatory
02B Demolition Recommended but not Mandatory
05A Structural Steel & Misc. Metals Recommended but not Mandatory
07C Roofing Recommended but not Mandatory
09A General Trades Recommended but not Mandatory
09B Framing, Drywall, and Ceilings Recommended but not Mandatory
09E Flooring Recommended but not Mandatory
09H Painting Recommended but not Mandatory
11D Lab Casework & Equipment Recommended but not Mandatory
12A Window Treatments Recommended but not Mandatory
21A Fire Protection Recommended but not Mandatory
22B Plumbing Recommended but not Mandatory
23A HVAC Recommended but not Mandatory
26A Electrical Recommended but not Mandatory