UP-Hamilton Bath Reno - Room Addition
Lighting and Electrical

Bid Date / Prevailing Time
Package Number
18
Pre-bid Date/Time
Pre-Bid Location
Meet out front of Hamilton Hall on the Burrowes Street side. Plan to park at one of the adjacent garages as parking at site will be limited. Please try to arrive 10-15 minutes early.
Pre-Bid Meeting
Recommended but not Mandatory
Awarded To
The Tri-M Group, LLC

All bid documents and bid submissions can be found on Building Connected. Access to this project can be found directly through Building Connected https://app.buildingconnected.com/login or through the Poole Anderson website https://www.pooleanderson.com/subcontractors/

Document Distribution
Document Cost
$0
Document Distribution Method
Building Connected
Anticipated Document Delivery